Project Awesome project awesome

MattHandzel/taskwarrior.nvim

Edit Taskwarrior tasks in a buffer, render tasks as Markdown checkboxes, bulk-edit with Vim motions, diff-and-apply on save. Inspired by oil.nvim.

Package 6 stars GitHub

taskwarrior.nvim

Status: Beta. Usable day-to-day, but APIs and defaults may still change before 1.0. Always keep an external backup of your Taskwarrior data (cp -r ~/.task ~/.task.bak); review the confirmation dialog before saving — :w issues real task modify / task done / task delete commands. Bug reports and PRs welcome.

Migrating from task.nvim? This plugin was renamed in v1.3.0. Update your lazy.nvim spec from matthandzel/task.nvim to matthandzel/taskwarrior.nvim and replace require("task") with require("taskwarrior") in your config. The :Task* commands and the taskmd filetype are unchanged. Saved views, registered projects, and apply backups migrate automatically the first time the plugin loads.

Edit your Taskwarrior tasks as markdown. Every vim motion, macro, and visual-mode operation becomes a task management operation for free. Inspired by oil.nvim.

hero demo: bulk-edit priorities with a substitute, save, watch them apply

:Task                                   -- open all pending tasks
V20j:s/project:Inbox/project:career/    -- reassign 20 tasks
dd                                      -- mark task done
o                                       -- add new task inline
:w                                      -- sync all changes at once

Browse, filter, group

filter and group demo

:TaskFilter project.startswith:work narrows to a project. :TaskGroup project splits the buffer into ## sections. :TaskSort due+ re-sorts within groups. None of this touches your Taskwarrior database — only the view.

Quick-capture from any buffer

quick capture demo

<leader>ta pops a floating window in any buffer. Type Fix auth bug project:work priority:H, press Enter, go back to what you were doing. The task is in Taskwarrior before your hand leaves the keyboard.


Visualize

Five built-in views read from Taskwarrior — no external charting tools.

:TaskBurndown — completion trend over time

burndown chart

ASCII bar chart of pending-task count by date. Reads entry and end dates from every task you've ever created, samples to fit the buffer width, color-codes by remaining height (red high → green low). Useful for "am I actually closing tasks faster than I'm opening them?"

:TaskTree — dependency graph

dependency tree

Renders depends: relationships as an indented tree. Top-level tasks are roots; └── and ├── connectors show parentage. Urgency score on the right is color-coded (red ≥8, orange ≥4, green below). Dead-simple way to find the leaf tasks that are unblocking everything else.

:TaskSummary — per-project stats

project summary

For each project: pending count, done count, overdue count, high-priority count, and a horizontal bar. Bar color is red if any task is overdue, orange if any is high-priority, blue otherwise. Footer shows total completion rate.

:TaskCalendar — by due date

calendar view

Pending tasks grouped by due date, ordered chronologically. Today is marked ← TODAY, overdue dates marked ⚠ OVERDUE. Tasks under each date show priority (!H/!M/!L) and project (@name).

:TaskTags — tag frequency

tags view

Every tag on every pending task with a count and frequency bar. Quick way to see which tags you're actually using vs. which were one-offs.


Power user

:TaskReview — guided urgency walk

guided review walkthrough

Walks pending tasks in urgency order. For each task: k keep, d defer, D mark done, m modify, g jump to it in the main buffer, q quit. Useful for the "weekly tidy" pass where you want to look at every urgent task and decide what to do with it without opening a separate buffer.

:TaskDelegate — hand a task to Claude

delegate popup

Opens a popup form (extra context, flags, model, system-prompt-file) and runs Claude in a visible bottom split. Visual-range support: V to select multiple task lines, then :TaskDelegate delegates them all in one Claude session. :TaskDelegate copy and :TaskDelegate copy-command copy the assembled prompt or the full shell invocation to the + register without spawning anything.

:TaskDiffPreview — see edits before you save

diff preview virt_text

Toggle with :TaskDiffPreview on. As you edit, virtual-text labels appear at end-of-line: + ADD, ~ MODIFY, ✓ DONE, ✗ DELETE, ▶ START, ◼ STOP. 400ms debounce keeps it from running on every keystroke. Same data the :w confirmation dialog uses — just shown live.

:TaskStart / :TaskStop

Mark the task on the cursor as actively in-progress (task UUID start) or pause it (task UUID stop). Active tasks show [>] in the buffer.

:TaskSave / :TaskLoad — saved views

:TaskSave morning saves the current filter+sort+group as a named view. :TaskLoad morning reopens it. Persisted to stdpath("data")/taskwarrior.nvim/saved-views.json. Tab-completes saved names.

:TaskUndo

Reverses the last save's actions. Reads the action log from the buffer's last apply and emits the inverse task modify / task add / task start calls. Best-effort — anything Taskwarrior cannot reverse (e.g. task delete on a UUID) is reported as an error.


Auto-project filter from cwd

Register the directories you work in:

:TaskProjectAdd career      -- maps cwd to project:career
:TaskProjectList            -- show all mappings
:TaskProjectRemove          -- unmap cwd

After that, :Task (with no filter) auto-applies project:<name> whenever you launch it from inside a registered directory. Persisted to stdpath("data")/taskwarrior_nvim_projects.json.


Ecosystem

These are bundled but require their own host plugins to be installed.

Module Path Activate
Telescope picker lua/telescope/_extensions/task.lua require("telescope").load_extension("task") then :Telescope task tasks
nvim-cmp source lua/taskwarrior/cmp.lua require("cmp").register_source("task", require("taskwarrior.cmp").new()) then add { name = "task" } to your cmp sources
Statusline component lua/taskwarrior/statusline.lua require("taskwarrior.statusline").render() — returns a string with the active task / overdue count / next due

Screenshots for these are coming once a richer demo init that loads telescope/cmp/lualine lands.


Requirements

  • Neovim ≥ 0.9
  • Taskwarrior ≥ 2.6 (compatible with 3.x)
  • Python ≥ 3.8 — only required for the optional bin/taskmd CLI and the live diff-preview virtual text. The default in-editor render/save path is pure Lua.

Installation

-- lazy.nvim
{
  "matthandzel/taskwarrior.nvim",
  config = function()
    require("taskwarrior").setup()
  end,
}

Quick Start

:Task                          -- view all pending tasks
:Task project:career +ais      -- filter tasks
:Task due.before:eow           -- tasks due this week

Edit any line. :w to sync. That's it.


All commands

Command Description
:Task [filter] Open task buffer with optional Taskwarrior filter
:TaskFilter [filter] Change filter on current buffer
:TaskSort <spec> Change sort order (e.g. due+, urgency-, priority-)
:TaskGroup [field] Change grouping (project, tag, or none)
:TaskRefresh Reload from Taskwarrior
:TaskAdd Quick-capture a task (floating window)
:TaskUndo Reverse last save's changes
:TaskHelp Show all commands, keybindings, syntax
:TaskStart / :TaskStop Start / stop active timer on task under cursor
:TaskSave <name> / :TaskLoad [name] Save / restore the current filter+sort+group as a named view
:TaskReview Guided urgency walk through pending tasks
:TaskDelegate [copy|copy-command] Delegate task(s) to Claude in a popup form
:TaskDiffPreview [on|off|toggle] Toggle live virt-text diff preview
:TaskBurndown Pending-task burndown chart
:TaskTree Dependency tree
:TaskSummary Per-project stats
:TaskCalendar Tasks grouped by due date
:TaskTags Tag-frequency view
:TaskProjectAdd [name] / :TaskProjectRemove / :TaskProjectList Auto-project mapping

Keybindings (buffer-local)

Key Action
<CR> Toggle task complete/pending
o New task below
O New task above
dd Delete task (marks done on save by default)
yy + p Duplicate task
ga Add annotation
gf View formatted task info
<leader>ta Quick-capture (global, works from any buffer)
<leader>tt Open task buffer (global)
<leader>tf Change filter (in task buffer)
<leader>ts Change sort (in task buffer)
<leader>tg Change group (in task buffer)
<leader>tpa Register cwd as a project

Metadata syntax

Tasks use Taskwarrior-native syntax after the description:

- [ ] Fix login bug project:Work priority:H due:2026-04-01 +urgent +backend

Fields: project:, priority: (H/M/L), due:, scheduled:, recur:, wait:, until:, effort:, depends:

Tags: +tagname (supports hyphens: +my-tag)

UDAs: Custom fields are auto-discovered from your Taskwarrior config (task _udas) and serialized inline. Verified: render, edit, save round-trip on both backends.

Configuration

require("taskwarrior").setup({
  on_delete = "done",          -- "done" or "delete" when lines are removed
  confirm = true,              -- show confirmation dialog before applying
  sort = "urgency-",           -- default sort (field+ for asc, field- for desc)
  group = nil,                 -- default group field (nil to disable)
  fields = nil,                -- fields to show (nil = all)
  capture_key = "<leader>ta",  -- global quick-capture (nil to disable)
  open_key = "<leader>tt",     -- global open-task-buffer (nil to disable)
  filter_key = "<leader>tf",   -- buffer-local filter (nil to disable)
  sort_key = "<leader>ts",     -- buffer-local sort
  group_key = "<leader>tg",    -- buffer-local group
  project_add_key = "<leader>tpa",  -- register cwd as a project
  filters = {},                -- named filter presets (see :h)
  projects = {},               -- directory-to-project mapping
  icons = true,                -- nerd font checkbox/header icons
  border_style = "rounded",    -- "rounded" | "single" | "double" | "none"
  capture_width = nil,         -- quick-capture width (nil = auto)
  capture_height = 3,          -- quick-capture height in lines
  auto_backup = true,          -- copy ~/.task to stdpath("data")/taskwarrior.nvim/backups/ before apply
  auto_backup_keep = 10,       -- number of recent backups to retain
  delegate = {
    command = "claude",
    flags = "",                -- e.g. "--dangerously-skip-permissions" (opt-in)
    model = nil,
    system_prompt_file = nil,
    height = 0.5,
  },
})

Custom urgency with UDAs

If you have custom UDA fields (e.g. utility, effort) and want them to affect task sort order, use urgency_coefficients. For each field, the urgency adjustment is value x coefficient — proportional to the actual numeric value, not just whether the field is present:

require("taskwarrior").setup({
  urgency_coefficients = {
    utility = 1.0,     -- utility:8 adds +8, utility:20 adds +20
    effort = -0.5,     -- effort:60 subtracts -30 (do easy wins first)
  },
})

The default is {} (no adjustments) — set only the fields you use.

For non-linear urgency (e.g. log(utility) or utility / effort), use custom_urgency — a Lua function that receives the full task table and returns a number:

require("taskwarrior").setup({
  custom_urgency = function(task)
    local base = task.urgency or 0
    local utility = tonumber(task.utility) or 0
    local effort = tonumber(task.effort) or 60
    return base + math.log(utility + 1) * 3 - math.sqrt(effort) * 0.1
  end,
})

How it works

  1. :Task runs the Lua backend (lua/taskwarrior/taskmd.lua) which calls task export, parses the JSON, and renders markdown checkboxes with concealed <!-- uuid:ab05fb51 --> markers
  2. You edit the buffer with standard vim operations
  3. On :w, the plugin diffs your edits against fresh Taskwarrior state
  4. A confirmation dialog shows what will change (:TaskDiffPreview on shows it live as you type)
  5. Changes are applied via task modify / task done / task add / task delete
  6. The buffer re-renders from Taskwarrior truth

UUID markers are invisible thanks to conceallevel=3 + concealcursor, and survive any vim operation that preserves the line.

Health check

Run :checkhealth taskwarrior to verify your setup (Neovim version, Taskwarrior CLI, optional Python, taskmd binary, data directory).

CLI usage

The bundled taskmd CLI is optional and works standalone for scripting and automation:

taskmd render project:Inbox --sort=due+      # markdown to stdout
taskmd render --group=project                # grouped view
taskmd apply tasks.md                         # sync edits back
taskmd apply tasks.md --dry-run              # preview changes as JSON
taskmd completions                            # JSON for editor completion

Useful for: piping rendered tasks through grep/fzf, automating bulk operations from shell scripts, integrating with non-vim editors.

Data safety

:w issues real task modify / task done / task add / task delete commands against your Taskwarrior database. There is no staging.

By default (auto_backup = true), the plugin copies your Taskwarrior data directory to stdpath("data")/taskwarrior.nvim/backups/<timestamp>/ immediately before any apply. The ten newest backups are kept; older ones are pruned. Disable with auto_backup = false in setup().

The CLI also refuses to apply a file with a missing or malformed header unless you pass --force, preventing the "hand-wrote a file, got every pending task marked done" failure mode.

You should still keep an external backup of ~/.task. The plugin's backups are a convenience, not a replacement.

Help

Run :help taskwarrior.nvim inside Neovim for the full reference, or read doc/taskwarrior.txt. :checkhealth taskwarrior verifies your setup.

Contributing

See CONTRIBUTING.md. Quick version:

python3 -m pytest tests/ -v        # 358 tests, stdlib-only CLI

Every bug fix needs a regression test. The Python test suite covers the bin/taskmd CLI and the Lua backend's parser/serializer/diff contract is tested via the CLI-compatibility boundary.

Changelog

See CHANGELOG.md.

License

MIT

Back to Neovim